All specialties

Surveys for social program evaluators

Funders ask projects to show the change they achieved. The evaluator measures the starting situation (baseline) and the end (endline) with the same instrument, supervises field interviewers and analyzes whether the difference is real.

Survey-based services you can offer

Baseline

Participants’ starting situation on the project indicators.

Monitoring

Short surveys during the project to adjust in time.

Endline

The same questions at the end to measure change.

Participant satisfaction

What they valued and what they would change.

Templates to start with

What to include in the proposal

  • Logframe indicators to be measured.
  • Design: before and after, with or without a comparison group.
  • Sample and selection method.
  • Fieldwork: interviewers, supervision, consent.
  • Deliverables, timeline and price.

What to deliver in the report

  • Technical sheet and fieldwork quality.
  • Indicators at baseline and endline.
  • Test of whether the change is significant.
  • Results by group (sex, area, age).
  • Conclusions and recommendations.

How to price the service

  • Fieldwork is the biggest cost: quote it per completed survey.
  • Design, analysis and report as fixed fees.

Common mistakes

  • Changing questions between baseline and endline.
  • Not supervising interviewers: made-up or duplicate surveys appear.
  • Attributing all the change to the project without a comparison group.

Frequently asked questions

How do I supervise field interviewers?
With one link per interviewer (hidden field), a daily check of response times and duplicates, and a progress dashboard per person.
Which test compares before and after?
With the same people: paired t-test or Wilcoxon; for yes/no answers, McNemar. There are free calculators for each.
Can it be used without internet?
Each response needs a connection. In areas without signal, run it on paper and import the responses from Excel into the same survey.

Free tools

Related guides

Other specialties